sheridancollege info20172 it project management using pmp project cost management

Part 1: Project Integration Management

After living in their house for 30 years, the Fulcher family decided to renovate the upstairs bathroom. It was still functional, but there were cracks in the walls, some of the tiles had fallen off, the lights were old fashioned, and the window and screen needed replacing. The huge bathtub was great when the children were in the house, but now that only Mr. and Mrs. Fletcher were living there, it was never used and wasted a lot of space.

After making the decision to renovate the bathroom, the Fletchers interviewed a few different contractors and did their due diligence regarding the professionalism and quality of the contractors. They decided to hire Build-It-Bob, the Bathroom Boys as their contracting company. The owner of Build-It-Bob, the Bathroom Boys, Mr. Bob Burton, was willing to start on July 1 and guaranteed completion by Sept 1 or they would refund 25% of the total cost of the contract, which was for $15,000. Fifteen thousand dollars seemed like a lot of money to the Fletcher, but they saw examples of the work Mr. Burton et al had done, and were convinced it would be worthwhile.

Tasks:
1.
Prepare a project charter for the Bathroom Renovation Project. Assume the project will take 2 months to complete (use any year you wish, starting July 1st with completion due September 1st) and the total budget is $15,000. This included $8,000 in materials (flooring; drywall; paint; tiles; lights; bathtub, toilet, sink and vanity; and pipes) and $7,000 in labour costs (Bob Burton – $200/hr; Billy Burton architect $120/hr; Bessy Burton demolition and build $80/hour; Brenda Burton plumber $150/hr; Bonnie Burton electrician $150/hr; and Tina Temp Student painter and mason (tile work) $50/hr).
You
are the child of the Fletchers, Chris, and since you are a professional project manager your parents have asked
you
to oversee the project to make sure everything goes as planned. Mr. Burton will work closely with
you
. Use the project charter template and examples of project charters in Chapters 3 and 4 as guidelines. Assume that the project sponsor is Mr. Fletcher. Include the main roles for other major stakeholders (Mrs. Fletcher, the members of the Build-It-Bob team, assorted vendors).

Part 2: Project Scope Management
Tasks:
1.
Develop a scope statement for the project. Use the example provided in Chapter 3, Table 3-9 Scope statement draft as a guide. Be as specific as possible in describing product characteristics, requirements, and deliverables.
2.
Develop a work breakdown structure (WBS) for the project. Break down the work to level 2 or level 3, as appropriate. Use the samples in Chapters 3 and 5 as guides. Save and deliver the WBS in list form as a Word file. Be sure to base your WBS on the project charter, scope statement, and other relevant information.
3.
Use the WBS you developed in the task above to create a Gantt chart in Project 2016 for the project. Use the outline numbering feature to display the outline numbers (click View, Gantt Chart Tools, Format, and click on the Outline Number box). Do not enter any durations or dependencies.

Part 3: Project Time Management
One of
your
duties as project manager is to lead the Burton team in developing and following a schedule.
You
have only 2 months to complete the project and all of the resources are full-time employees who have other contracts to work on at the same time. In addition to preparing a Gantt chart,
you
also plan to give everyone a simple milestone report.
You
make sure you black out weeks when people are working on the other projects. Mr. Burton wants all the requirements settled by July 5, and the design completed by July 10 so he can begin getting building permits. He would like to have all the samples available by July 15 so the Fletchers can finalize their choices by July 20th. Between July 1 and July 20, tearing down the existing bathroom will occur.

Tasks:
1.
Identify at least eight milestones for this project. Write a short paper describing each milestone using the SMART criteria.
2.
Review the WBS and Gantt chart you created in Part 2 above. Review the key milestone dates Mr. Burton provided and a typical schedule for bathroom renovation. Develop a simple schedule in the form of a milestone report. For the milestone report, see the sample in Chapter 3.
3.
Create a Gantt chart for the project, including the milestones, resources and dependencies.
4.
Estimate how many hours each person would work on each task listed in your Gantt chart.

Part 4: Project Cost Management

Recall that your budget is $15,000 for this two-month project. Also remember that the Build-It-Bob team have other contracts though Mr. Burton has committed to having his team spend between 40% and 60% of their time at the Fletcher site.

Tasks:
1.
Prepare and include a cost estimate for the project, similar to the one provided in Figure 7-2 (NOT Table 7-2) in Chapter 7. Use the WBS and hours estimates you created in Part 3. Assume that the vanity and sink you selected cost $2,000, the tub costs $2500, the paint, flooring, and drywall cost $1400, the toilet costs $800, the lighting cost $300, and $150 for new pipes. Include the hours for each person, and calculate the budget for labour costs as well as the fixed costs.

Read less







Calculate Your Essay Price
(550 words)

Approximate price: $22

Calculate the price of your order

550 words
We'll send you the first draft for approval by September 11, 2018 at 10:52 AM
Total price:
$26
The price is based on these factors:
Academic level
Number of pages
Urgency
Basic features
  • Free title page and bibliography
  • Unlimited revisions
  • Plagiarism-free guarantee
  • Money-back guarantee
  • 24/7 support
On-demand options
  • Writer’s samples
  • Part-by-part delivery
  • Overnight delivery
  • Copies of used sources
  • Expert Proofreading
Paper format
  • 275 words per page
  • 12 pt Arial/Times New Roman
  • Double line spacing
  • Any citation style (APA, MLA, Chicago/Turabian, Harvard)

Our guarantees

Delivering a high-quality product at a reasonable price is not enough anymore.
That’s why we have developed 5 beneficial guarantees that will make your experience with our service enjoyable, easy, and safe.

Money-back guarantee

You have to be 100% sure of the quality of your product to give a money-back guarantee. This describes us perfectly. Make sure that this guarantee is totally transparent.

Read more

Zero-plagiarism guarantee

Each paper is composed from scratch, according to your instructions. It is then checked by our plagiarism-detection software. There is no gap where plagiarism could squeeze in.

Read more

Free-revision policy

Thanks to our free revisions, there is no way for you to be unsatisfied. We will work on your paper until you are completely happy with the result.

Read more

Privacy policy

Your email is safe, as we store it according to international data protection rules. Your bank details are secure, as we use only reliable payment systems.

Read more

Fair-cooperation guarantee

By sending us your money, you buy the service we provide. Check out our terms and conditions if you prefer business talks to be laid out in official language.

Read more

Order your essay today and save 10% with the coupon code: best10